In May and November 2026, conformity assessment bodies, standardization committees, and spectrum regulators gathered for the 51st and 52nd meetings of the Radio Equipment Compliance Association (REDCA). The sessions took place in Warsaw, Poland (6–7 May 2026) and Barcelona, Spain (4–5 November 2026). Both events included joint sessions with the European Union Association of Notified Bodies (EUANB).
These briefings mapped out major technical and procedural updates across Europe, North America, and Japan. Engineers, testing laboratories, manufacturers, distributors, and market surveillance authorities face new rules across several areas. Cybersecurity mandates, Harmonised Standard delays, spectrum allocations, and stricter U.S. laboratory rules are reshaping global market access.
European Cybersecurity Standardization and the Cyber Resilience Act
European Standardization Organizations (CEN, CENELEC, and ETSI) are building the technical framework for the Radio Equipment Directive (RED) Delegated Act and the EU Cyber Resilience Act (CRA). During the May 2026 session, the European Commission reported ongoing work on a revised standardisation mandate. This mandate covers RED Articles 3.1, 3.2, and 3.3(g).
The Commission also detailed updates to the common charger report, USB specification references, and external power supply labelling. In addition, officials reviewed reconfigurable radio systems and the overlap between the RED and the EU AI Act. However, the Commission reported no plans to introduce a delegated act empowering Notified Bodies to issue compliance statements for high-risk AI systems under the RED.
By November 2026, CEN/CENELEC JTC 13 WG 8 and 9 outlined four core horizontal CRA standards under development. Committees shortened voting and public enquiry timelines to keep pace with regulatory schedules:
-
Part 1: Vocabulary
-
Part 2: Principles, product risk management, and lifecycle activities
-
Part 3: Vulnerability handling
-
Part 4: Generic security requirements
To help conformity assessment bodies prepare, REDCA will extend its next meeting by one day to host a dedicated CRA workshop. Meanwhile, REDCA Working Groups continue updating key Technical Guidance Notes. These updates cover TGN 20 (SAR Guidance Document), TGN 33 (RED as applied to vehicles), and TGN 38 (Radio modules, expanded for cybersecurity obligations).
ETSI Harmonised Standard Delays
For test laboratories and compliance engineers, delays in citing Harmonised Standards in the Official Journal of the European Union (OJEU) create a major bottleneck. Technical disputes surrounding ETSI Harmonised Standards cause an average publication delay of 373 days across four primary areas:
-
Environmental Profiles: Regulators and industry are debating module self-declaration when a host environment exceeds the standard’s environmental profile. Legal wording remains pending, so manufacturers must currently use the Notified Body route.
-
Alternative Test Sites: The European Commission opposes allowing both 10-meter chambers and Open Area Test Sites (OATS). Industry groups warn of severe cost spikes if rules permit only 10-meter chambers.
-
9 kHz Emission Gaps: Historic gaps between 2 kHz and 9 kHz lack established test methods. Standard scopes will keep this explicit restriction.
-
Power Requirements: The Commission mandates power level requirements even where no national regulatory limit exists, such as for IMT base stations.
CENELEC TC 210 EMC Standardisation Hurdles
On the electromagnetic compatibility side, CENELEC TC 210 (chaired by Sébastien Août) detailed similar OJEU citation hurdles for standards supporting RED Article 3.1(b). The committee also requested additional technical experts to support Working Group 18 (WG18) on immunity standards. Several key product-family EMC standards face recorded “lack of compliance” issues that block immediate citation:
-
EN IEC 55011:2025/prAA:2026 (industrial, scientific, and medical equipment) has 2 lack-of-compliance findings and advances to final vote.
-
EN IEC 55014-1:2021/FprAA:2026 (household appliances and electric tools emissions) has 4 lack-of-compliance findings. Its final vote runs until 20 November 2026, with alternative test site questions still unresolved.
-
EN IEC 55014-2:2021/prAA:2026 (household appliances and electric tools immunity, including prA1:2026) has 1 lack-of-compliance finding.
-
EN 55032:2015/FprAB:2026 (multimedia equipment emissions) has 3 lack-of-compliance findings. It remains on hold while CISPR 32:2026 moves through the Final Draft International Standard (FDIS) stage.
Market Surveillance Findings Under ADCO RED
Market enforcement data from the May 2026 meeting shows why regulators scrutinize technical documentation closely. Across joint campaigns, 11 European market surveillance authorities examined 14,000 radio equipment products. Inspectors found 9,500 of those products non-compliant.
To help manufacturers and distributors follow compliance rules, ADCO RED updated the official RED Guide. The new guidance covers interconnected radio equipment, placing products on the market, the common charger, and the cybersecurity Delegated Act. During the November session, REDCA also reviewed its Refused Certificates database and NANDO Notified Body membership tracking.
ECO and CEPT Spectrum Policy Updates
The European Communications Office (ECO) outlined active spectrum management work linking the European Commission, ETSI, and CEPT across multiple wireless technologies:
-
Upper 6 GHz Band: Following the March 2026 approval of ECC Report 375, CEPT published Report 92 and Report 94. Report 92 addresses coexistence between Mobile/Fixed Communications Networks, Radio Local Area Networks, and incumbent users, while Report 94 covers shared-use feasibility. Public consultations on 6 GHz RLAN revisions remain open until 20 and 27 November 2026.
-
Direct-to-Device (D2D) and Drone Detection: Regulators approved CEPT Report 93 covering Direct-to-Device satellite connectivity. Committees also started new compatibility studies on drone detection.
-
Short Range Devices (SRD) and Wireless Power Transmission (WPT): Working group SRD/MG is advancing the 10th SRD update. This update should yield dedicated EU Implementing Decisions for Low Power Devices – Satellite (LPD-S) and WPT. Under ERC/REC 70-03, officials published Annex 12 (medical applications), while Annex 9 (inductive medical applications) and ECC/REC(25)01 (WPT) remain in consultation. Regulators also published the ECC Report 289 Addendum covering WPT for electric vehicle (EV) charging.
-
Ultra-Wideband (UWB) and Equipment Consultations: Under the EC permanent mandate for UWB, regulators await WG SE compatibility studies. Public consultation on ECC Report 351 (vehicular UWB in the 116 to 148.5 GHz band) closed on 2 November 2026. Separate consultations covering IoT-S terminals, PMR446, and LPD-S run through 20 and 27 November 2026.
U.S. FCC Equipment Authorization Orders
In the United States, the Federal Communications Commission (FCC) enacted major structural changes to its equipment authorization program under ET Docket No. 24-136. Industry stakeholders commonly call this the “Bad Labs” or “Trusted Labs” proceeding:
-
First Report and Order (FCC 25-27): Effective 8 September 2025, entities owned or controlled (10% or more equity or voting interest) by prohibited entities lose FCC recognition. This rule covers Telecommunication Certification Bodies (TCBs), testing laboratories, and accreditation bodies. CABs and accreditation bodies will eventually report ownership of 5% or more, though active reporting rules are not yet in force.
-
Second Report and Order (FCC 26-28): Effective 15 June 2026, this order speeds up Pre-Approval Guidance (PAG) reviews for devices tested in reciprocal economies. It also strengthens market surveillance and creates a confidential reporting channel for national security concerns. CABs will eventually identify the number and location of personnel once reporting rules take effect.
-
Third Report and Order (FCC 26-73): The FCC adopted this rule on 29 October 2026 and released it on 30 October 2026 (Federal Register publication is pending). Effective 1 December 2028, the FCC will stop recognizing testing laboratories located in non-reciprocal economies. Furthermore, testing laboratories, TCBs, and accreditation bodies cannot perform “covered activities” inside non-reciprocal economies.
NIST Telecom MRA and International Coordination
Representing the U.S. Designating Authority, the National Institute of Standards and Technology (NIST) shared updates on the Telecom MRA Program. Currently, 105 U.S. CABs holding over 500 recognitions participate in the program. Nineteen U.S.-located TCBs also participate, down by three since May 2026.
NIST reminded stakeholders of strict operational requirements. U.S. TCBs must maintain an FCC-recognized testing lab within their own economy and limit certifications to their lab’s recognized scope. They must also undergo reassessment every two years, while U.S.-based EU Notified Bodies must maintain active REDCA membership. Finally, NIST noted ongoing MRA coordination with the United Kingdom and bilateral work with Japan’s Ministry of Internal Affairs and Communications (MIC) to build a reference chart for verifying test-equipment calibration intervals.
Practical Implications for Industry and Testing Laboratories
Manufacturers, distributors, and testing facilities managing multi-region launches face tighter procedural scrutiny and longer planning lead times. In Europe, unresolved citation disputes around alternative test sites and environmental profiles complicate compliance paths. Teams must carefully evaluate when Notified Body involvement is mandatory rather than relying solely on self-declaration.
In the United States, hardware manufacturers using overseas test facilities should audit their laboratory partnerships early. The 1 December 2028 FCC deadline bars covered conformity assessment activities in non-reciprocal economies.
To coordinate global testing strategies and track shifting EU, U.S., and international certification rules, organizations can leverage the Entirety Product Certification Service for end-to-end market access support.